Spray Can Paint Process (Single Stage)

Automotive Paint supplies

Note: shake all cans well for a minimum of 5 minutes

Dry times are based on applying materials in temperatures of 20 degrees or above. If the temperature is lower, allow for more dry time between coats.

Holding the can 8-12 inches from panel, apply your first coat in a light to medium coat with a 50% overlap. Allow 15-20 minutes before applying the second coat.

On your second coat, still holding can 8-12 inches from panel, apply a medium to heavy coat, also with a 50% overlap. Allow 15-20 minutes before applying the next coat of colour.

Some colours may require a 3rd coat for full coverage which will be applied the same way as the second coat.

Allow 24hrs of dry time before handling.