Spray Can Paint Process (Base/Clear)

Note: shake all cans well for a minimum of 5 minutes

Dry times are based on applying materials in temperatures of 20 degrees or above. If the temperature is lower, allow for more dry time

Holding the can 8-12 inches from the panel, apply your first coat in a light to medium coat with a 50% overlap. Allow 15-20 minutes before applying second coat.

On your second coat, still holding the can 8-12 inches from the panel, apply a medium to heavy coat also with a 50% overlap. Allow another 15-20 minutes before applying the next coat of colour.

Some colours may require a 3rd coat for full coverage, which will be applied the same way as the second coat.

For light metallics (i.e. silver/gold) an orientation coat may need to be applied to ensure an even look on the metallic. This is done by moving the can 12-16 inches from panel and applying coat in a misting fashion.

Once you are satisfied with your paint, allow 15-20 minutes of dry time before applying the first coat of clear.

The first coat of clear should be applied lightly, while holding the can 8-12 inches from the panel with a 50% overlap. Allow 15-20 minutes of dry time before applying the second coat.

On your second coat, holding the can 8-12 inches from the panel, apply a medium to heavy coat with a 50% overlap. Allow another 15-20 minutes for it to dry before applying last coat of clear which is applied in the same way as the second coat.

Allow 24 hrs of dry time before handling if a 1k clear has been used